14:36 16 Nov 26
Project
1927 :
Wuchang Natural Gas Generation Project
| Project title |
Wuchang Natural Gas Generation Project
- project design document (1224 KB)
(accepted -
02 Mar 2011 -
-
view previous)
PDD appendices Appendix 1 - Revised PDD_Tracked (1653 KB)
Appendix 2 - Revised IRR calculation (184 KB)
Appendix 3 - Levelized Cost calculation (154 KB)
- registration request form (518 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (931 KB)
authorization (931 KB)
Authorized Participants: Hubei Huadian Wuchang Thermal Power Co., Ltd. |
| Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (31 KB)
authorization (31 KB)
Authorized Participants: Trading Emissions PLC (withdrawn as of 21/03/2017) |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
AM0029 -
Methodology for Grid Connected Electricity Generation Plants using Natural Gas
|
| Standardized baselines used | N/A |
| Amount of Reductions | 209,918 metric tonnes CO2 equivalent per annum |
| Fee level | USD 40483.6 |
| Validation Report |
Validation report (499 KB)
Public availability information
Link to information uploaded for public availability Validation opinion on changes in PDD (88 KB)
|
| Modalities of Communication |
Modalities of Communication valid as of 21/02/2012 MoC Annex 2 (Withdraw Project Participant) valid as of 21/03/2017 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 05/03/2012 |
| Registration Date | 15 Jun 09 (view history) |
| Crediting Period |
15 Jun 09 - 14 Jun 16
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 2 - Revised IRR calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: