10:05 02 Dec 24
Project
1922 :
Daning Coal Mine Methane Power Generation Project in Jincheng City Shanxi Province, China
Project title |
Daning Coal Mine Methane Power Generation Project in Jincheng City Shanxi Province, China
- project design document (436 KB) PDD appendices Appendix 1 - 1922 financial analysis (124 KB) Appendix 2 - CER calculation sheet (17 KB) - registration request form (544 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
China
, involved indirectly
approval (255 KB)
authorization (255 KB)
Authorized Participants: Jincheng City Fengrun CMM Utilization Co.Ltd China |
Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (33 KB)
authorization (33 KB)
Authorized Participants: Trading Emissions PLC |
Sectoral scopes |
8 : Mining/mineral production
1 : Energy industries (renewable - / non-renewable sources) 10 : Fugitive emissions from fuels (solid, oil and gas) |
Activity Scale | LARGE |
Methodologies Used |
ACM0002 ver. 6 -
Consolidated methodology for grid-connected electricity generation from renewable sources
ACM0008 ver. 3 - Consolidated methodology for coal bed methane and coal mine methane capture and use for power (electrical or motive) and heat and/or destruction by flaring |
Standardized baselines used | N/A |
Amount of Reductions | 416,565 metric tonnes CO2 equivalent per annum |
Fee level | USD 81813.0 |
Validation Report |
Validation report (572 KB)
Public availability information
Link to information uploaded for public availability |
Modalities of Communication | |
Registration Date | Rejected (view history) |
Crediting Period | 01 Sep 08 - 31 Aug 15 (Renewable) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: