Project 1922 : Daning Coal Mine Methane Power Generation Project in Jincheng City Shanxi Province, China
Project title Daning Coal Mine Methane Power Generation Project in Jincheng City Shanxi Province, China
- project design document (436 KB)

PDD appendices
Appendix 1 - 1922 financial analysis (124 KB)
Appendix 2 - CER calculation sheet (17 KB)


- registration request form (544 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (255 KB) authorization (255 KB)
Authorized Participants: Jincheng City Fengrun CMM Utilization Co.Ltd China
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (33 KB) authorization (33 KB)
Authorized Participants: Trading Emissions PLC
Sectoral scopes 8 : Mining/mineral production
1 : Energy industries (renewable - / non-renewable sources)
10 : Fugitive emissions from fuels (solid, oil and gas)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 6 - Consolidated methodology for grid-connected electricity generation from renewable sources
ACM0008 ver. 3 - Consolidated methodology for coal bed methane and coal mine methane capture and use for power (electrical or motive) and heat and/or destruction by flaring
Standardized baselines used N/A
Amount of Reductions 416,565 metric tonnes CO2 equivalent per annum
Fee level USD 81813.0
Validation Report Validation report (572 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)  
Crediting Period 01 Sep 08 - 31 Aug 15 (Renewable)