06:04 28 Dec 25
Project
1901 :
Electricity grid interconnection San Gabán – Mazuko – Puerto Maldonado
| Project title |
Electricity grid interconnection San Gabán – Mazuko – Puerto Maldonado
- project design document (589 KB)
PDD appendices Appendix 1 - investment analysis (9059 KB)
Appendix 2 - ER (209 KB)
Appendix 3 - EF (6130 KB)
Appendix 4 - Estudios bono (552 KB)
- registration request form (482 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Peru
, involved indirectly
approval (612 KB)
authorization (612 KB)
Authorized Participants: Electro Sureste S.A.A. |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 6 -
Consolidated methodology for grid-connected electricity generation from renewable sources
AM0045 - Grid connection of isolated electricity systems |
| Standardized baselines used | N/A |
| Amount of Reductions | 17,819 metric tonnes CO2 equivalent per annum |
| Fee level | USD 2063.8 |
| Validation Report |
Validation report (1032 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Rejected (view history) |
| Crediting Period | 01 Sep 08 - 31 Aug 15 (Renewable) |

project design document
Appendix 1 - investment analysis
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: