Project 1721 : 2*6MW Coke Oven Gas Power Generation Project in Xiangcheng County
Project title 2*6MW Coke Oven Gas Power Generation Project in Xiangcheng County
- project design document (644 KB)

PDD appendices
Appendix 1 - Loan (4845 bytes)
Appendix 2 - IRR COG (511 KB)
Appendix 3 - 20090421_xiangcheng COG project IRR and sentivity analysis_Final_mcl.xls_1721 (510 KB)


- registration request form (515 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (156 KB) authorization (156 KB)
Authorized Participants: Mingyuan Fuel Gas Thermoelectricity Co., Ltd
Other Parties Involved Switzerland , involved indirectly approval (70 KB) authorization (70 KB)
Authorized Participants: First Climate (Switzerland) AG (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0004 ver. 2 - Consolidated methodology for waste gas and/or heat for power generation
ACM0002 ver. 6 - Consolidated methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 64,558 metric tonnes CO2 equivalent per annum
Fee level USD 11411.6
Validation Report Validation report (638 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Modalities of Communication valid as of 26/03/2012
MoC Annex 2 (Withdraw Project Participant) valid as of 26/03/2012
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 26/03/2012
Registration Date 21 Apr 09   (view history)  
Crediting Period 21 Apr 09 - 20 Apr 19 (Fixed)
Requests for Issuance
and related documentation