09:14 30 Jul 26
Project
1721 :
2*6MW Coke Oven Gas Power Generation Project in Xiangcheng County
| Project title |
2*6MW Coke Oven Gas Power Generation Project in Xiangcheng County
- project design document (644 KB)
PDD appendices Appendix 1 - Loan (4845 bytes)
Appendix 2 - IRR COG (511 KB)
Appendix 3 - 20090421_xiangcheng COG project IRR and sentivity analysis_Final_mcl.xls_1721 (510 KB)
- registration request form (515 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (156 KB)
authorization (156 KB)
Authorized Participants: Mingyuan Fuel Gas Thermoelectricity Co., Ltd |
| Other Parties Involved |
Switzerland
, involved indirectly
approval (70 KB)
authorization (70 KB)
Authorized Participants: First Climate (Switzerland) AG (withdrawn) |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0004 ver. 2 -
Consolidated methodology for waste gas and/or heat for power generation
ACM0002 ver. 6 - Consolidated methodology for grid-connected electricity generation from renewable sources |
| Standardized baselines used | N/A |
| Amount of Reductions | 64,558 metric tonnes CO2 equivalent per annum |
| Fee level | USD 11411.6 |
| Validation Report |
Validation report (638 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
Modalities of Communication valid as of 26/03/2012 MoC Annex 2 (Withdraw Project Participant) valid as of 26/03/2012 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 26/03/2012 |
| Registration Date | 21 Apr 09 (view history) |
| Crediting Period | 21 Apr 09 - 20 Apr 19 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 2 - IRR COG
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: