18:17 23 Jan 26
Project
1598 :
Emission reductions through partial substitution of fossil fuel with alternative fuels in the 2 cement plants of PT Holcim Indonesia Tbk
| Project title |
Emission reductions through partial substitution of fossil fuel with alternative fuels in the 2 cement plants of PT Holcim Indonesia Tbk
- project design document (752 KB)
PDD appendices Appendix 1 - ER calculation spreadsheet (267 KB)
Appendix 2 - Evidence of CDM consideration 1 (32 KB)
Appendix 3 - Evidence of CDM consideration 2 (26 KB)
Appendix 4 - IRR calculation (33 KB)
Appendix 5 - IRR calculation (sensitivity analysis) (33 KB)
Appendix 6 - Minutes meeting HCMC 060530 (31 KB)
Appendix 7 - Schedule (639 KB)
Appendix 8 - Draft PDD (197 KB)
Appendix 9 - Validation offer (37 KB)
Appendix 10 - First draft validation report (37 KB)
Appendix 11 - Annual investment details (367 KB)
- registration request form (543 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Indonesia
, involved indirectly
approval (146 KB)
authorization (146 KB)
Authorized Participants: PT Holcim Indonesia Tbk. |
| Other Parties Involved |
Switzerland
, involved indirectly
approval (348 KB)
authorization (348 KB)
Authorized Participants: Holcim Group Support Ltd. ; Holcim Environment Service SA |
| Sectoral scopes | 4 : Manufacturing industries |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0003 ver. 4 -
Emissions reduction through partial substitution of fossil fuels with alternative fuels in cement manufacture
|
| Standardized baselines used | N/A |
| Amount of Reductions | 516,706 metric tonnes CO2 equivalent per annum |
| Fee level | USD 101841.2 |
| Validation Report |
Validation report (883 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 20/04/2012 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 03/01/2013 MoC Annex 2 (Add Project Participant) valid as of 03/06/2011 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 01/03/2011 |
| Registration Date | 02 Sep 08 (view history) |
| Crediting Period | 02 Sep 08 - 01 Sep 18 (Fixed) |
| Requests for Issuance
and related documentation |
Monitoring report: 02 Sep 2008 - 31 Dec 2008 (195 KB)Issuance request state: Issued CERs requested up to 31 December 2012: 12335 Serial Range: Block start: ID-5-1209152-1-1-0-1598 Block end: ID-5-1221486-1-1-0-1598 [Full view and history] Monitoring report: 01 Jan 2009 - 31 Dec 2010 (878 KB)Issuance request state: Issued CERs requested up to 31 December 2012: 124195 Serial Range: Block start: ID-5-5593113-1-1-0-1598 Block end: ID-5-5717307-1-1-0-1598 [Full view and history] |

project design document
Appendix 1 - ER calculation spreadsheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: