Project: 1510 Yunnan Mopo River 12.5 MW Hydropower Project - Crediting Period Renewal Request
[]
Project 1510: Yunnan Mopo River 12.5 MW Hydropower Project

- project design document (1094 KB)

PDD appendices
Appendix 1 - ER spreadsheet-20150403.xlsx (52 KB)

- crediting period renewal form (779 KB)
Methodologies Used AMS-I.D. ver. 18 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 31,273 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (703 KB)
Renewal Date 21 Jul 15 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 29 Apr 15 - 28 Apr 22

Other crediting period(s): 29 Apr 08 - 28 Apr 15
Requests for Issuance
and related documentation