Project: 1498 Baji River Stage I 10MW Run-of-river Hydropower Project - Crediting Period Renewal Request
[]
Project 1498: Baji River Stage I 10MW Run-of-river Hydropower Project

- project design document (578 KB)

PDD appendices
Appendix 1 - ER sheet (34 KB)

- crediting period renewal form (528 KB)
Methodologies Used AMS-I.D. ver. 18 - Grid connected renewable electricity generation
VVS Version VVS 7.0
Standardized baselines used N/A
Amount of Reductions 29,259 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (139 KB)
Renewal Date 20 Jan 16 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 05 Apr 15 - 04 Apr 22

Other crediting period(s): 05 Apr 08 - 04 Apr 15
Requests for Issuance
and related documentation