23:59 29 Oct 26
Project:
1431 Sichuan Zhaojiashan 20MW Hydropower Project
- Crediting Period Renewal Request
[]
| Project |
1431: Sichuan Zhaojiashan 20MW Hydropower Project
- project design document (1135 KB)
PDD appendices Appendix 1 - ER SHEET-RN1431 2nd CP (126 KB)
- crediting period renewal form (55 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 56,603 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (308 KB)
|
| Renewal Date |
29 Mar 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
12 Jun 15 - 11 Jun 22
Other crediting period(s): 12 Jun 08 - 11 Jun 15 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER SHEET-RN1431 2nd CP
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: