Project title of the project activity or programme of activities (PoA) for which issuance is requestedIrani Wastewater Methane Avoidance Project (1410)
DOE that requested for issuance and date of requestDNV (15 Jul 09)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The DOE is requested to clarify how it verified the actual installed capacity of electric devices considering the inconsistency between the installed capacity in reference data sheet (0.84051 MW) and in the CER calculation sheet (0.8 MW).

OTHER ISSUES
The DOE is requested to clarify how it verified the appropriateness of the calibration of spectrophotometer HACH 2000 (calibration certificates issued on 08/08/2007 and 03/09/2008) and #9 flume (certificates issued on 06/07/2007 and 09/09/2008) considering that it is confirmed by the DOE the yearly calibration is adequate for both equipment, though no specific frequency is requested or mentioned in the applied methodology and the monitoring plan.
Date 03 Oct 09