06:14 11 Feb 26
Project:
1222 Xiangziyan Hydroelectric Project
- Crediting Period Renewal Request
[]
| Project |
1222: Xiangziyan Hydroelectric Project
- project design document (1358 KB)
PDD appendices Appendix 1 - Xiangziyan Hydropower-ER (79 KB)
- crediting period renewal form (111 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 57,715 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (478 KB)
|
| Renewal Date |
13 May 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
01 Jan 15 - 31 Dec 21
Other crediting period(s): 01 Jan 08 - 31 Dec 14 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Xiangziyan Hydropower-ER
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: