19:02 14 Jan 25
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Burning of solid biomass for process steam generation for beer manufacture in place of the BPF 3 fuel oil at the Įguas Claras do Sul Branch (1202) |
---|---|
DOE that requested for issuance and date of request | DNV (14 Jan 10) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
1) The PDD states that the two old boilers are used as a back up for the system consuming fuel oil only. However, it is noted that old boilers were not only fuelled by fuel oil but also animal tallow. As the types of fossil fuel used in the boilers affect the baseline emission calculation, further clarification is required on how the DOE verified the emission reduction as per the registered PDD. 2)Carbon fraction actually oxidized in combustion was not used in emission reduction calculation as per the formula stated in registered PDD. Further clarification is required. |
|
Date | 18 Apr 10 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: