Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedFujian Pingtan Changjiang’ao 100 MW Wind Power Project (1177)
DOE that requested for issuance and date of requestTÜV SÜD (30 Jan 09)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The DOE/PP are requested to clarify:
1. How it verified that the calculation of net electricity exported using the electricity of meter 153*(1-1.35%)-(the electricity of meters 175 + 170 + 303)*2.3% and calculation of line losses using readings of the three meters (175, 170, 303) located in Gaoshan substation is in accordance with the monitoring plan. In addition, a schematic diagram that depicts the locations of various meters and the two substations should be provided.
2. Why the document [IRL 17], which was a confirmation by the grid company of electricity exported during 19/12/07 to 27/12/07 was issued after the verification period on 27/08/2008.
Date 24 Feb 09