Project: 1118 Jiangsu Dongtai 201MW Wind Power Project - Crediting Period Renewal Request
[]
Project 1118: Jiangsu Dongtai 201MW Wind Power Project

- project design document (1226 KB)

PDD appendices
Appendix 1 - 1118_-_ERs_calculation (40 KB)
Appendix 2 - PA1118_F-CDM-MOC_form (417 KB)

- crediting period renewal form (368 KB)
Methodologies Used ACM0002 ver. 14 - Grid-connected electricity generation from renewable sources
VVS Version
Standardized baselines used N/A
Amount of Reductions 342,769 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (310 KB)
Renewal Date 10 Sep 14 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 11 Aug 14 - 10 Aug 21

Other crediting period(s): 11 Aug 07 - 10 Aug 14
Requests for Issuance
and related documentation