12:20 17 Sep 26
Project:
1045 4.5 MW Industrial Waste based Grid-connected Power Project
- Issuance Request
| Project | 1045: 4.5 MW Industrial Waste based Grid-connected Power Project |
|---|---|
| ISSUANCE STATUS | Issued (on 17 Mar 09) |
| Monitoring period | 30 Mar 04 - 22 Sep 07 |
| Monitoring report |
Monitoring report (1244 KB)
|
| Request for issuance |
Signed form (655 KB)
Before corrections: Signed form (652 KB)
|
| Amount of CERs |
CERs issued up to 31 December 2012:
53,107
Serial Range:
Block start: IN-5-60662385-1-1-0-1045
Block end: IN-5-60715491-1-1-0-1045
Before corrections: 53374 |
| Verification and certification reports |
Certification report (188 KB)
Verification report (188 KB)
Before corrections: Certification report (117 KB)
Verification report (117 KB)
|
| Additional documents |
ER calculation rev. (80 KB)
Monitoring Plan rev. (885 KB)
Before corrections: Excel (79 KB)
Reviced monitoring report (1665 KB)
|
| Request for review |
Request 1
Request 2 Request 3 EB meeting: EB45 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: DOE Initial comments (30 KB)
PP Initial comments (647 KB)
Annex 1 - DNV_Final Verification Report_1045_Clean (188 KB)
Annex 2 - DNV_Final Verification Report_1045_Track changes (189 KB)
Annex 3 - revised Monitoring Report Clean (866 KB)
Annex 4 - revised Monitoring Report Tack changes (867 KB)
Annex 5 - ER calculation table 13.01.09 (82 KB)
|

Monitoring report
ER calculation rev.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: