Project title of the project activity or programme of activities (PoA) for which issuance is requested6.5MW WHR Project in Huasheng Tianya Cement Co., Ltd. (1038)
DOE that requested for issuance and date of requestBVI (12 Jul 10)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The PDD indicates a turbine model N6.5-1.25 (steam pressure and temperature of 1.25Mpa and 300°C respectivelly, as per Feasibility Study Report) to be installed in the project activity, however the DOE verified that a turbine model N6.5-1.27 was installed instead (steam pressure and temperature of 1.27Mpa and 280°C respectivelly, as per turbine nameplate). The DOE should clarify why a request for changes in the PDD was not submitted prior to the fourth request for issuance as per EB48 Annex 66.
Date 18 Nov 10