Project: 1031 Rio Taquesi Hydroelectric Power Project - Issuance Request
Project 1031: Rio Taquesi Hydroelectric Power Project
 
ISSUANCE STATUS Issued (on 15 Jun 11)  
Monitoring period 01 Jul 08 - 30 Jun 09
Monitoring report Monitoring report (679 KB)
 
Request for issuance Signed form (310 KB)
Amount of CERs CERs issued up to 31 December 2012: 184,083
Serial Range: Block start: BO-5-933720-1-1-0-1031     Block end: BO-5-1117802-1-1-0-1031
Verification and certification reports Certification report (463 KB)
Verification report (463 KB)
Additional documents 20c. a) SMEC 08jul-09jun.xls.zip (8899 KB)
6g. TaqMNTRepJul08Jun09v3 5-20110317(RMI2) (814 KB)
21c. b) HB GROSSGEN 08jul-09jun (1600 KB)
22c. 1.1) Dispatch 08jul-08oct (5634 KB)
23c. 1.2) Dispatch 08nov-09abr (7342 KB)
26c. 3) Annex3 08jul-09jun (1615 KB)
24c 1.3) Dispatch 09may-09jun (3055 KB)