16:00 07 Feb 26
Project:
1031 Rio Taquesi Hydroelectric Power Project
- Issuance Request
| Project | 1031: Rio Taquesi Hydroelectric Power Project |
|---|---|
| ISSUANCE STATUS | Issued (on 15 Jun 11) |
| Monitoring period | 01 Jul 08 - 30 Jun 09 |
| Monitoring report |
Monitoring report (679 KB)
|
| Request for issuance |
Signed form (310 KB)
|
| Amount of CERs |
CERs issued up to 31 December 2012:
184,083
Serial Range:
Block start: BO-5-933720-1-1-0-1031
Block end: BO-5-1117802-1-1-0-1031
|
| Verification and certification reports |
Certification report (463 KB)
Verification report (463 KB)
|
| Additional documents |
20c. a) SMEC 08jul-09jun.xls.zip (8899 KB)
6g. TaqMNTRepJul08Jun09v3 5-20110317(RMI2) (814 KB)
21c. b) HB GROSSGEN 08jul-09jun (1600 KB)
22c. 1.1) Dispatch 08jul-08oct (5634 KB)
23c. 1.2) Dispatch 08nov-09abr (7342 KB)
26c. 3) Annex3 08jul-09jun (1615 KB)
24c 1.3) Dispatch 09may-09jun (3055 KB)
|

Monitoring report
20c. a) SMEC 08jul-09jun.xls.zip
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: