Project 1030 : Pão de Açúcar – Demand side electricity management – PDD 2
Project title Pão de Açúcar – Demand side electricity management – PDD 2
- project design document (384 KB)

PDD appendices
Appendix 1 - Brazil doc1 (6421 KB)
Appendix 2 - Brazil doc2 (7455 KB)
Appendix 3 - Brazil doc3 (1348 KB)
Appendix 4 - Brazil doc4 (95 KB)


- registration request form (537 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Brazil , involved indirectly approval (108 KB) authorization (108 KB)
Authorized Participants: Companhia Brasileira de Distribuição – Grupo Pão de Açúcar ; Ecoinvest Carbon Brasil
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
3 : Energy demand
Activity Scale SMALL
Methodologies Used AMS-I.D. ver. 10 - Grid connected renewable electricity generation
ACM0002 ver. 6 - Consolidated methodology for grid-connected electricity generation from renewable sources
AMS-II.E. ver. 8 - Energy efficiency and fuel switching measures for buildings
Standardized baselines used N/A
Amount of Reductions 2,324 metric tonnes CO2 equivalent per annum
Fee level USD 0.0
Validation Report Validation report (301 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)  
Crediting Period 01 Jan 01 - 31 Dec 10 (Fixed)