Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | N2O Emission Reduction in nitric acid plant Paulínia, SP, Brazil (1011) |
---|---|
DOE that requested for issuance and date of request | TÜV SÜD (13 Feb 09) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
For the calculation of baseline N2O emission factor, both N2O values and NAP values measured beyond the length of normal campaign length during the production of the quantity of nitric acid (i.e. the final tonnes produced) were eliminated. Further clarification is required on how the DOE has verified the baseline N2O emission factor considering that methodology specifies that N2O values measured beyond the length of normal campaign length are to be eliminated from the calculation of baseline emission factor. |
|
Date | 06 Mar 09 |