Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedMethane recovery and effective use of power generation project Norte III-B Landfill. (0928)
DOE that requested for issuance and date of requestSGS (16 Sep 11)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1) The monitoring of fossil fuels used to operate tha project (Diesel and LPG) was conducted in accordance with the monitoring methodology, but these parameters were not included in the monitoring plan. The DOE is required to clarify how it has verified that the monitoring was conducted in accordance with the registered monitoring plan and the reasons for not submitting a request for revision of the monitoring plan. Please refer to VVM version 1.2 - paragraph 216.

2) The DOE is required to explain how it has verified the QA/QC procedures were correctly applied over the monitored parameters, as it was observed in the calculation spreadsheet that the percentage of methane concentration varied up to 99.9% (on 14/01/2011, at 14:00:38). Please refer to VVM version 1.2 - Paragraph 205.

3) The DOE is required to clarify how it has verified the correct calculation of ERs, as it was observed in the submitted spreadsheet that for several records either the flare temperature or gas flow or both at the same time were not within the ranges specified by the manufacturer, i.e. 800ºC to 982ºC and 1,083.97 Nm3/h to 6,498.72 Nm3/h, respectively (e.g., on 06/November/2010 at 11:56:26; on 07/November/2010 at 12:04:02; on 26/October/2010 at 13:32:26, among other records). Please refer to VVM version 1.2 - Paragraph 208.
Date 28 Feb 12