Issuance Request for Review Form
|
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
|---|
| Project title of the project activity or programme of activities (PoA) for which issuance is requested | Landfill gas recovery and electricity generation at “Mtoni Dumpsite”, Dar Es Salaam, Tanzania (0908) |
|---|---|
| DOE that requested for issuance and date of request | TÜV SÜD (10 Dec 10) |
| Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
| Incompetence | |
| Please indicate reasons for the request for review | |
|
1. The PP/DOE shall clarify how is justified the dta on flare temperature higher than 500°C and in some cases higher than 850°C during the period when the average gas flow rate was less than 300Nm3/hr, considering that as per the manufacturer’s specification the average gas flow rate higher than 300Nm3/hr ensures a temperature of 850°C. 2. The DOE shall clarify how the assumption of 50% of flare efficiency is justified when the flare temperature is between 500°C and 850°C is in accordance with the revised monitoring plan which does not specify this requirement and/or the requirement of the ‘Tool to determine project emissions from flaring gases containing methane’ which specifies limit on temperature of the exhaust gas and not the flare temperature. |
|
| Date | 16 Jan 11 |