07:32 25 Oct 25
Project:
0884 Gansu Dang River Hydropower Project
- Crediting Period Renewal Request
[]
| Project |
0884: Gansu Dang River Hydropower Project
- project design document (1273 KB)
PDD appendices Appendix 1 - EF-NWPG2013 1106 (163 KB)
- crediting period renewal form (211 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 14 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | |
| Standardized baselines used | N/A |
| Amount of Reductions | 141,169 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (630 KB)
|
| Renewal Date |
19 Feb 14
(Renewable - Expired)
(view history)
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
01 May 14 - 30 Apr 21
Other crediting period(s): 01 May 07 - 30 Apr 14 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - EF-NWPG2013 1106
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: