13:05 16 Nov 26
Project:
0883 Liaoning Changtu Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
0883: Liaoning Changtu Wind Farm Project
- project design document (359 KB)
PDD appendices Appendix 1 - ER sheet (42 KB)
- crediting period renewal form (551 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 7.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 89,695 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (140 KB)
|
| Renewal Date |
08 Jan 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
16 Apr 14 - 15 Apr 21
Other crediting period(s): 16 Apr 07 - 15 Apr 14 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: