Project: 0883 Liaoning Changtu Wind Farm Project - Crediting Period Renewal Request
[]
Project 0883: Liaoning Changtu Wind Farm Project

- project design document (359 KB)

PDD appendices
Appendix 1 - ER sheet (42 KB)

- crediting period renewal form (551 KB)
Methodologies Used ACM0002 ver. 16 - Grid-connected electricity generation from renewable sources
VVS Version VVS 7.0
Standardized baselines used N/A
Amount of Reductions 89,695 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (140 KB)
Renewal Date 08 Jan 16 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 16 Apr 14 - 15 Apr 21

Other crediting period(s): 16 Apr 07 - 15 Apr 14
Requests for Issuance
and related documentation