02:29 29 Dec 25
Project:
0847 Up-gradation of Gas Turbine 1 (GT 1) and Gas Turbine 2 (GT 2) at co-generation plant of Hazira Gas Processing Complex (HGPC) of Oil and Natural Gas Corporation Limited (ONGC)
- History
| Project | 0847: Up-gradation of Gas Turbine 1 (GT 1) and Gas Turbine 2 (GT 2) at co-generation plant of Hazira Gas Processing Complex (HGPC) of Oil and Natural Gas Corporation Limited (ONGC) |
|---|
Data before acceptance of changes in PDD on 17 Feb 2012
| CDM-PDD |
project design document (441 KB)
PDD appendices Appendix 1 - CER calculation (32 KB)
Appendix 2 - Cost of Production and supply shortfall (234 KB)
Appendix 3 - BHEL communication (153 KB) |
|---|

project design document
Appendix 1 - CER calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: