Project: 0835 Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project - Issuance Request
Project 0835: Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project
 
ISSUANCE STATUS Issued (on 07 Dec 17)   completeness check: complete | info & rep check: concluded
Monitoring period 01 Jan 15 - 31 Dec 16
Monitoring report Monitoring report (895 KB)
 
Request for issuance Signed form (558 KB)
Amount of CERs CERs issued from 01 Jan 2013 until 31 December 2020: 21,670
Serial Range: Block start: KR-5-164674992-2-2-0-835     Block end: KR-5-164696661-2-2-0-835
Verification and certification reports VVS/VVM version: VVS 9.0
Certification report (870 KB)
Verification report (870 KB)
Additional documents ER calculation sheet (2245 KB)
Monitoring report_Ref.0835_6th (919 KB)
issuance form_ver.05.0 (623 KB)