08:43 28 Jan 25
Project:
0835 Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project
- History
Project | 0835: Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project |
---|
Data before approval of the request for post-registration changes on 29 Nov 2012
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (801 KB)
PDD appendices Appendix 1 - PDD with track changes (857 KB) Appendix 2 - Enclosure (36 KB) Appendix 3 - Enclosure 1 (98 KB) Appendix 4 - Enclosure 2 (105 KB) Appendix 5 - Enclosure 3 (100 KB) Appendix 6 - Enclosure 4 (311 KB) Appendix 7 - Enclosure 5 (309 KB) Appendix 8 - Enclosure 6 (211 KB) Appendix 9 - Enclosure 7 (49 KB) Appendix 10 - Enclosure 8 (179 KB) |
Validation opinion on changes in PDD | Validation opinion on changes in PDD (1547 KB) |
Data before acceptance of changes in PDD on 20 May 2011
CDM-PDD |
project design document (947 KB)
PDD appendices Appendix 1 - NPV analysis 1 (94 KB) Appendix 2 - NPV analysis 2 (101 KB) Appendix 3 - NPV analysis 3 (96 KB) |
---|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: