Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedDemand side energy conservation and reduction measures at ITC Tribeni Unit (0745)
DOE that requested for issuance and date of requestDNV (17 Sep 08)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The verification report (p.6) states that “For activities wherein energy meters were not in place, power consumption is measured by fluke meter once every month during the project period. Annual average power consumption during the project period has been computed from the instantaneous fluke meter reading and annual average run hours of the main equipment”. Further information is required on how the DOE has verified the power consumption for activities where energy meters were not in place in accordance with the methodology which requires metering of the energy use.
Date 01 Oct 08