Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | A joint venture project of cogeneration of electricity and hot water using natural gas and biogas produced from on-site wastewater biodigesters (0478) |
---|---|
DOE that requested for issuance and date of request | ICONTEC (28 Dec 12) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
1) The DOE is requested to explain how it has verified that calibration was conducted in line with the registered monitoring plan, considering that the verification report states that calibration is not required once instruments have been set into operation, whereas the registered monitoring plan indicates that calibration of the instruments utilised for the measurement of the monitoring variables is done on a monthly basis (PDD, page 15) Please refer to paragraph 184 (b) (iv) and paragraph 216 of the VVM v.1.2, and EB 52 Annex 60. | |
Date | 27 Mar 13 |