Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedPronaca: Tropicales-Plata Swine Waste Management (0460)
DOE that requested for issuance and date of requestTÜV SÜD (15 May 09)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. The DOE shall clarify how it has verified the monitoring of the moisture of solid manure piles as the verification report (page A-40) states that all solid manure waste is “disposed anaerobically”, while the monitoring of this parameter is to “prevent the material from entering anaerobic conditions” (page 6 of PDD).

OTHER ISSUES
2. Corrections shall be made throughout the verification and certification reports: the ending date of the monitoring period should be 31 August 2007, instead of 30 September 2008.
3. The DOE shall clarify what equipment was used to monitor the swine herd inventories since it verified this equipment was calibrated according to the requirement of the approved monitoring plan (page 10 of verification report).
Date 03 Jul 09