22:54 21 Dec 25
Project:
0395 LDEO Biomass Steam and Power Plant in Malaysia
- Crediting Period Renewal Request
[]
| Project |
0395: LDEO Biomass Steam and Power Plant in Malaysia
- project design document (700 KB)
PDD appendices Appendix 1 - VVS-SSC-CDM_PDD_LDEO_2nd_crediting_period_ver_4 (832 KB)
- crediting period renewal form (908 KB)
|
|---|---|
| Methodologies Used |
AMS-I.C. ver. 19 -
Thermal energy production with or without electricity
AMS-III.E. ver. 16 - Avoidance of methane production from decay of biomass through controlled combustion, gasification or mechanical/thermal treatment |
| VVS Version | |
| Standardized baselines used | N/A |
| Amount of Reductions | 33,290 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (4472 KB)
|
| Renewal Date |
09 Dec 14
(Renewable - Expired)
(view history)
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
10 Jun 13 - 09 Jun 20
Other crediting period(s): 10 Jun 06 - 09 Jun 13 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - VVS-SSC-CDM_PDD_LDEO_2nd_crediting_period_ver_4
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: