Project: 0395 LDEO Biomass Steam and Power Plant in Malaysia - Crediting Period Renewal Request
[]
Project 0395: LDEO Biomass Steam and Power Plant in Malaysia

- project design document (700 KB)

PDD appendices
Appendix 1 - VVS-SSC-CDM_PDD_LDEO_2nd_crediting_period_ver_4 (832 KB)

- crediting period renewal form (908 KB)
Methodologies Used AMS-I.C. ver. 19 - Thermal energy production with or without electricity
AMS-III.E. ver. 16 - Avoidance of methane production from decay of biomass through controlled combustion, gasification or mechanical/thermal treatment
VVS Version
Standardized baselines used N/A
Amount of Reductions 33,290 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (4472 KB)
Renewal Date 09 Dec 14 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 10 Jun 13 - 09 Jun 20

Other crediting period(s): 10 Jun 06 - 09 Jun 13
Requests for Issuance
and related documentation