15:17 16 Sep 26
Project:
0402 SEO Biomass Steam and Power Plant in Malaysia
- Crediting Period Renewal Request
[]
| Project |
0402: SEO Biomass Steam and Power Plant in Malaysia
- project design document (958 KB)
PDD appendices Appendix 1 - VVS-SSC-CDM_PDD_SEO_2nd_crediting_period_ver_5(15.09.2015) (70 KB)
- crediting period renewal form (989 KB)
|
|---|---|
| Methodologies Used |
AMS-III.E. ver. 17 -
Avoidance of methane production from decay of biomass through controlled combustion, gasification or mechanical/thermal treatment
AMS-I.C. ver. 20 - Thermal energy production with or without electricity |
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 51,701 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (3327 KB)
|
| Renewal Date |
14 Apr 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
10 Jun 13 - 09 Jun 20
Other crediting period(s): 10 Jun 06 - 09 Jun 13 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - VVS-SSC-CDM_PDD_SEO_2nd_crediting_period_ver_5(15.09.2015)
Offset now: visit the United Nations Carbon Offset Platform