Project: 0388 Fujian Zhangpu Liuao 30.6 MW Wind Power Project - Crediting Period Renewal Request
[]
Project 0388: Fujian Zhangpu Liuao 30.6 MW Wind Power Project

- project design document (1338 KB)

PDD appendices
Appendix 1 - 0388 CER Calculation (131 KB)

- crediting period renewal form (19 KB)
Methodologies Used ACM0002 ver. 12 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
VVS Version
Standardized baselines used N/A
Amount of Reductions 55,697 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (886 KB)
Renewal Date 13 Jan 13 (Renewable)   (view history)  
Crediting Period (requested for renewal) 01 Jan 13 - 31 Dec 19

Other crediting period(s): 01 Jan 06 - 31 Dec 12 01 Jan 20 - 31 Dec 26
Requests for Issuance
and related documentation