20:38 29 Sep 26
Project:
0388 Fujian Zhangpu Liuao 30.6 MW Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
0388: Fujian Zhangpu Liuao 30.6 MW Wind Power Project
- project design document (1338 KB)
PDD appendices Appendix 1 - 0388 CER Calculation (131 KB)
- crediting period renewal form (19 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 12 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| VVS Version | |
| Standardized baselines used | N/A |
| Amount of Reductions | 55,697 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (886 KB)
|
| Renewal Date | 13 Jan 13 (Renewable) (view history) |
| Crediting Period (requested for renewal) |
01 Jan 13 - 31 Dec 19
Other crediting period(s): 01 Jan 06 - 31 Dec 12 01 Jan 20 - 31 Dec 26 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 0388 CER Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: