14:26 02 Jan 25
Project:
0340 Reduction in steam consumption in stripper reboilers through process modifications
- Issuance Request
Project | 0340: Reduction in steam consumption in stripper reboilers through process modifications |
---|---|
ISSUANCE STATUS | Issued (on 17 Sep 09) |
Monitoring period | 15 May 06 - 03 Feb 08 |
Monitoring report | Monitoring report (228 KB) |
Request for issuance |
Signed form (802 KB)
Before corrections: Signed form (883 KB) |
Amount of CERs |
CERs issued up to 31 December 2012:
59,208
Serial Range:
Block start: IN-5-71578735-1-1-0-340
Block end: IN-5-71637942-1-1-0-340
Before corrections: 63961 |
Verification and certification reports |
Certification report (235 KB)
Verification report (235 KB) Before corrections: Certification report (221 KB) Verification report (221 KB) |
Additional documents |
Monitoring Report Version 7 (266 KB)
Emission Reduction Calculation Sheet (5396 KB) Extract from Jamnagar Crude Manual (50 KB) FO EF actual (35 KB) Before corrections: Monitoring report Version 4 (238 KB) CER Spreadsheet (5396 KB) |
Request for review |
Request 1
Request 2 Request 3 EB meeting: EB47 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: DOE Initial comments (86 KB) Annex 1 FO EF actual (35 KB) Annex 2 Extract from Jamnagar Crude Manual (50 KB) Annex 3.1 Trial period CDU-II - Baseline SSCR estimation (654 KB) Annex 3.2 Trial period CDU-II - Baseline SSCR estimation (1) (93 KB) Annex 3.3 Trial period CDU-II - Baseline SSCR estimation (2) (96 KB) Annex 4 UK AR6 CDM.VER0097-Revised Original - 13.03.2009 (233 KB) |
Review |
Scope (92 KB)
EB meeting: EB48 (at which the report of the review team was/will be considered) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: