Project title of the project activity or programme of activities (PoA) for which issuance is requestedLandfill gas recovery at the Norte III Landfill, Buenos Aires, Argentina. (0260)
DOE that requested for issuance and date of requestRINA (06 Mar 12)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1) The DOE has confirmed that two additional parameters ("electricity consumption" and "emission factor of the grid") were monitored in order to accont for project emissions, however these parameters were not included in the revised monitoring plan. The DOE is required to clarify how it has verified that the monitoring was conducted in line with the revised monitoring plan and the reasons for not raising a FAR (Forward Action Request), indicating that the monitoring of these two parameters will be included in a post-registration change request. Please refer to VVM version 1.2 - paragraphs 205 and 216.

2) Based on the data submitted every 2 minutes, the DOE is requested to clarify how it has verified that the gas sent to the engine was destroyed and ERs were correctly accounted, as for a same time instant, records indicate that gas was being sent to the engine whereas no electricity was generated (e.g. on 01/04/2011 at 00:01:45, on 1/4/2011 at 00:40:04, amon several others). Please refer to VVM version 1.2 - paragraph 208.
Date 21 May 12