12:17 30 Jun 25
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Quimobásicos HFC Recovery and Decomposition Project (0151) |
---|---|
DOE that requested for issuance and date of request | TÜV SÜD (22 Jan 10) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
1. The DOE is required to clarify how it verified that the calibration of all measurement instruments, except for the HFC23 flow-meter, was done according with the requirements from the methodology (i.e., monthly frequency). 2. The PP informed that the plant was operational for 50 days, which is less than the total number of days in the monitoring period. The DOE is required to clarify how it verified that the methodology requirements regarding the analysis of the effluent gas to check leaked HFC23 when the thermal oxidizer stops were complied. |
|
Date | 29 Apr 10 |