Project title of the project activity or programme of activities (PoA) for which issuance is requestedHiriya Landfill Project (0147)
DOE that requested for issuance and date of requestSGS (04 Mar 09)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. Further clarification is required on how the monitoring of methane content has been measured
continuously in line with the methodology and monitoring plan, in particular:
i. There were no methane analysis results either from continuous analyser or portable analyser for
several days throughout December 2006 - July 2008;
ii. The application of iterative method to determine monthly methane concentration which resulted in a
higher figure than the average daily values for several months.
2. It was reported that the flare efficiency was conducted quarterly, however the DOE only verified 2
certificates dated May 2005 and April 2007 (p.11 Verification Report and Document references).