Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedAbanico Hydroelectric Project (0141)
DOE that requested for issuance and date of requestAENOR (11 Jul 08)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. According to the PDD the second phase of the project (22.62 MW) was to be commissioned in January 2008. However, the commissioning date of the phase II was not provided in the monitoring report or verification report. The DOE is required to clarify:
1) how it verified the implementation of the project activity as per the PDD.
2) how it verified the emission reductions considering that the emission reduction during this monitoring period is 72% higher than the estimation in the PDD and the electricity generation suddenly increased from July 2007.
2. The monitoring plan requires the parameters related to grid emission factor to be annually monitored while the ex-ante grid emission factor has been applied to the calculation of the emission reduction in the monitoring report. The DOE is required to clarify how it verified the calculation of the emission reduction in accordance with the monitoring plan.
Date 14 Aug 08