02:03 22 Dec 24
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Essaouira wind power project (0030) |
---|---|
DOE that requested for issuance and date of request | AENOR (29 Oct 09) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
The approved deviation (DEV0181) stated that the net electricity generation is calculated from the gross generation readings from SCADA and estimated transmission loss and the DOE stated in the deviation request that “To know the percentage of losses, the proponent used the net electricity data measured after the setting of the meters and comparing it with the gross generation, and with the recommendation of the manufacturer of the equipment, choosing the most conservative values.” Further clarification is required on how the DOE verified the correct calculation of the net electricity generation for the period of March - July 2007 as per the approved deviation considering the fact that the ‘net production in MWh’ in the spreadsheet was not calculated using the ‘gross production’ and the estimated loss (in percentage). (Other Issues) The DOE shall clarify how it verified that the use of 2.5225%, maximum percentage of total energy loss of the facility, is in line with the approved deviation whereas the monitored loss in February 2008 was 2.7907%. |
|
Date | 11 Feb 10 |
Offset now: visit the United Nations Carbon Offset Platform