Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedLa Esperanza Hydroelectric Project (0009)
DOE that requested for issuance and date of requestTÜV NORD (16 Feb 11)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The monitoring report states that the main meter having serial number 028694866, owned by the national utility ENEE, was last calibrated on 05/05/2006. The DOE has confirmed that as per national regulations in Honduras, calibration frequency for meters determined by ENEE is every 5 years. The DOE is requested to clarify how it verified that:
i) the calibration of the main meter is in accordance with paragraph 17(c)of the "General Guidelines to SSC CDM methodologies" EB 58, Annex 23 which states that measuring equipments should be calibrated at least once in 3 years.
ii) The emission reductions from the project activity are appropriate in accordance with EB 52, Annex 60 "Guidelines for assessing compliance with the calibration frequency requirements".
Date 26 Apr 11