19:49 25 Nov 26
Project
6286 :
Chongqing Pingxiang CMM Utilization Project, China
| Project title |
Chongqing Pingxiang CMM Utilization Project, China
- project design document (1061 KB)
PDD appendices Appendix 1 - ER sheet (37 KB)
Appendix 2 - Revised IRR sheet (106 KB)
- registration request form (122 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (101 KB)
authorization (101 KB)
Authorized Participants: Chongqing Ton Gu Tan Coal Management Co. Ltd. |
| Other Parties Involved |
Japan
, involved indirectly
approval (199 KB)
authorization (199 KB)
Authorized Participants: Mitsubishi UFJ Morgan Stanley Securities Co. Ltd. (withdrawn) |
| Sectoral scopes |
8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0008 ver. 7 -
Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 107,275 metric tonnes CO2 equivalent per annum |
| Fee level | USD 19955.0 |
| Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (717 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 24/07/2013 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 23/07/2013 MoC Annex 2 (Withdraw Project Participant) valid as of 18/07/2013 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 07/05/2013 |
| Registration Date | 31 Oct 12 (Date of registration action 31 Dec 12) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 01 Nov 12 - 31 Oct 22 (Fixed) |
|
Status of a registered
project activity report |
The project activity or PoA is under implementation, but has not reached the stage of monitoring GHG emission reductions or removal enhancements |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: