12:43 11 Nov 26
Project
5972 :
Jiangxi Leping Mining Administration Low Concentration CMM Utilization Project
| Project title |
Jiangxi Leping Mining Administration Low Concentration CMM Utilization Project
- project design document (973 KB)
PDD appendices Appendix 1 - ER sheet (25 KB)
Appendix 2 - IRR sheet (103 KB)
Appendix 3 - IRR sheet-after deduction of VAT (104 KB)
- registration request form (143 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (537 KB)
authorization (537 KB)
Authorized Participants: Leping Mining Administration |
| Other Parties Involved |
Switzerland
, involved indirectly
approval (277 KB)
authorization (277 KB)
Authorized Participants: Bunge Emissions Holdings Sarl |
| Sectoral scopes |
8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0008 ver. 7 -
Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 131,967 metric tonnes CO2 equivalent per annum |
| Fee level | USD 24893.4 |
| Validation Report |
Validation report (592 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 15/06/2012 |
| Registration Date | 05 Apr 12 (Date of registration action 14 Jun 12) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 05 Apr 12 - 04 Apr 22 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: