Project: 5838 Hubei Shiyan Zhuxi Baishahe Hydropower Station - Crediting Period Renewal Request
[]
Project 5838: Hubei Shiyan Zhuxi Baishahe Hydropower Station

- project design document (1780 KB)

PDD appendices
Appendix 1 - Hubei Shiyan Zhuxi Baishahe Hydropower Station (5838)-ER Calculation Sheet (161 KB)
Appendix 2 - List of documents submitted_Hubei Shiyan Zhuxi Baishahe Hydropower Station (212 KB)

- crediting period renewal form (363 KB)
Methodologies Used ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 57,141 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (540 KB)
Renewal Date 05 Feb 20 (Renewable)   (view history)   completeness check info & rep check: concluded
Crediting Period (requested for renewal) 01 Apr 19 - 31 Mar 26

Other crediting period(s): 01 Apr 12 - 31 Mar 19
Requests for Issuance
and related documentation