20:46 05 Jul 26
Project:
5838 Hubei Shiyan Zhuxi Baishahe Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
5838: Hubei Shiyan Zhuxi Baishahe Hydropower Station
- project design document (1780 KB)
PDD appendices Appendix 1 - Hubei Shiyan Zhuxi Baishahe Hydropower Station (5838)-ER Calculation Sheet (161 KB)
Appendix 2 - List of documents submitted_Hubei Shiyan Zhuxi Baishahe Hydropower Station (212 KB)
- crediting period renewal form (363 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 57,141 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (540 KB)
|
| Renewal Date | 05 Feb 20 (Renewable) (view history) completeness check info & rep check: concluded |
| Crediting Period (requested for renewal) |
01 Apr 19 - 31 Mar 26
Other crediting period(s): 01 Apr 12 - 31 Mar 19 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Hubei Shiyan Zhuxi Baishahe Hydropower Station (5838)-ER Calculation Sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: