Project 10005 : Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa
Project title Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa
- project design document (952 KB)

PDD appendices
Appendix 1 - Driefontein Fuelswitch ER Calculations.xlsx (39 KB)
Appendix 2 - Driefontein Investment Analysis.xlsx (58 KB)
Appendix 3 - CCL 232 PDD (track changes) (952 KB)
Appendix 4 - CCL 232 IRC Response Letter (378 KB)
Appendix 5 - CCL 232 VR (track changes) (2434 KB)


- registration request form (732 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties South Africa , involved indirectly approval (422 KB) authorization (422 KB)
Authorized Participants: Corobrick (Pty) Ltd.
Other Parties Involved n/a
Sectoral scopes 4 : Manufacturing industries
Activity Scale SMALL
Methodologies Used AMS-III.Z. ver. 4 - Fuel Switch, process improvement and energy efficiency in brick manufacture
Standardized baselines used N/A
Amount of Reductions 37,944 metric tonnes CO2 equivalent per annum
Fee level USD 6088.8
Validation Report VVS/VVM version: VVS 6.0
Validation report (1825 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 24/03/2015
Registration Date 20 Dec 14 (Date of registration action 20 Mar 15)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Jan 15 - 31 Dec 21 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation