Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 7632 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Clinker Optimization in cement types production at Derba MIDROC cement Plant |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1) The DOE shall further substantiate how it has validated the compliance of the project activity with the applicability conditions of the methodology, in particular, how it has validated that blending of cement outside the cement production plants is not a common practice in the host country through checking the production data of the cement plants. Please refer to ACM0005, version 07, page 2. 2) The DOE shall further explain how it has validated the appropriateness of the identified baseline scenarios, in particular the baseline scenarios of cement type CEMII/B-L and CEM IV considering that the two types of blended cement have never been produced in or imported to the host country. In doing so, the DOE shall also explain how it has validated that the Portland cement with 95% clinker has a comparable quality of cement CEMII/ B-L & CEM IV/B, considering that the PDD (p 4) states that the lowest allowable clinker shares of CEM II/B-L and CEM IV/B are 65% and 45% respectively as per Ethiopian cement standard ES 1177 - 1:2005. Please refer to ACM0005, version 7, page 4.. 3) The DOE shall explain how it has validated the correctness and conservativeness of the baseline emissions, in particular: (a) parameter BCy, since the interpretation of parameter BCy (Blended cement production) in the PDD is not consistent with the requirement of the applied methodology (p 7) that states that BCy is the blended cement produced and sold in the domestic market. (b) the method applied to update the parameter BBlend,y.since the method applied in the PDD (p 30) is not in line with the formula of option 2 specified in the applied methodology (p 10). Please refer to ACM0005, version 7, page 7 & 10.. 4) The DOE shall explain how it has validated the conservativeness of the ex-ante parameters, in particular the baseline benchmark of share of clinker of BC CEMII/B-L and CEM IV /B (BBlend,1). In doing so, the DOE shall explain how it has validated that the Portland cement with 95% clinker has a comparable quality of cement CEMII/ B-L & CEM IV/B. Please also note that: (a) According to Ethiopian cement standard ES 1177 - 1:2005, the lowest allowable clinker share of CEM II/B-L is 65% and the lowest allowable clinker share of CEM IV/B is 45%. (b) The applied methdology (p 9) states that data concerning average blending ratio, annual production and import of the relevant cement type(s) in the region shall be collected for one year prior to the start date of CDM project activity. (c) In case relevant cement type imported by the host country is considered in determining the benchmark, the information on the clinker share of the imported cement type should be provided as specified on the cement bag or import document as per the applied methodology (p 10). Please refer to VVS version 2, paragraph 98. |
|
Date | 19 Oct 13 |