06:14 30 Oct 25
Project:
7507 Qinghai Maqin Gequ Level 2 Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
7507: Qinghai Maqin Gequ Level 2 Hydropower Station
- project design document (812 KB)
PDD appendices Appendix 1 - Untitled (uploaded 13 Aug 21 04:32:32) (35 KB)
- crediting period renewal form (250 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 20 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 123,721 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (534 KB)
|
| Renewal Date | 28 Oct 21 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period (requested for renewal) |
01 Jan 21 - 31 Dec 27
Other crediting period(s): 01 Jan 14 - 31 Dec 20 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Untitled (uploaded 13 Aug 21 04:32:32)
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: