Project 9006 : Installation of Top-Pressure Recovery Turbine at Blast Furnace -4
Project title Installation of Top-Pressure Recovery Turbine at Blast Furnace -4
- project design document (799 KB)

PDD appendices
Appendix 1 - Emission_Factor_for_Internal_Grid_1_Nov_2012 (206 KB)
Appendix 2 - TRT4_IRR__Nov_1st_2012 (115 KB)
Appendix 3 - TRT_4_CER_Calculation_1_Nov,_2012 (30 KB)
Appendix 4 - TRT_Common_Practice_Analysis (196 KB)


- registration request form (373 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (151 KB) authorization (151 KB)
Authorized Participants: JSW Steel Limited
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used ACM0012 ver. 4 - Consolidated baseline methodology for GHG emission reductions from waste energy recovery projects
Standardized baselines used N/A
Amount of Reductions 50,380 metric tonnes CO2 equivalent per annum
Fee level USD 8576.0
Validation Report VVS/VVM version: VVM 1.2
Validation report (4145 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Feb 13 - 31 Jan 23 (Fixed)