Project: 8550 Huaneng Xinjiang Balikun Santanghu Second Wind Farm Phase I 49.5MW Project - Crediting Period Renewal Request
[]
Project 8550: Huaneng Xinjiang Balikun Santanghu Second Wind Farm Phase I 49.5MW Project

- project design document (749 KB)

PDD appendices
Appendix 1 - Huaneng Xinjiang Balikun Santanghu Second Wind Farm Phase I 49.5MW Project (8550)_ER sheet (17 KB)

- crediting period renewal form (111 KB)
Methodologies Used ACM0002 ver. 20 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 82,261 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (317 KB)
Renewal Date 06 Jan 21 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 30 Jun 21 - 29 Jun 28

Other crediting period(s): 30 Jun 14 - 29 Jun 21
Requests for Issuance
and related documentation