14:58 23 Feb 25
Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 6971 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Methane Recovery in Wastewater Treatment and Utilization for Electricity Generation at Saremas 1 Palm Oil Mill, Sarawak, Malaysia |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1) The DOE has validated that AMS I.C, version 19 is applicable to the energy generation component of the project activity, which is the generation of electricity from biogas to displace electricity produced from diesel engines in the baseline. However, according to paras. 1 and 2 of AMS I.C, version 19, the methodology comprises renewable energy technologies that supply users with thermal energy that displaces fossil fuel use, including biomass-based cogeneration systems.The DOE is requested to further explain how it has validated the applicability of the methodology AMS I.C to the project activity, including the appropriateness of the continuation of the diesel generator operation for electricity generation as the baseline scenario for the energy generation component of the project activity and the corresponding baseline emissions from the use of fossil fuels for electricity generation to meet the electricity demand of the project owner. Please refer to VVM v1.2 paragraphs 68, 81-82 and 89.. 2) In the baseline emission calculation "Baseline emissions from discharge of treated effluent to aerobic ponds (BEww,discharge,y)", due to one-year historical data of Palm Oil Mill is not available, as per AMS-III.H version 16 paragraph 27 b, measurement by project proponent(s) in the 10 days measurement campaign (12/10/2010-21/10/2010) on the existing project site are used for the baseline emission estimation. According to AMS III.H, para 27b, concerning measurement campaign, it states that: “The measurements should be undertaken during a period that is representative for the typical operation conditions of the systems and ambient conditions of the site (temperature, etc)”. However, in the PDD and the Validation Report, the PP/DOE did not provide justification on how the measurement period is considered to be representative as per AMS III.H version 16. The DOE is requested to further provide justification on how it has validated that the measurement period is representative for the baseline emission calcuation (BEww,discharge,y) as per AMS III.H version 16. Please refer to VVM v1.2 para 89. 3) The PDD uses the “Tool to determine project emissions from flaring gases containing methane” version 1. This version of the tool is not valid since 20/07/2012. However, the request for registration of the project activity was submitted on 10/08/2012. The DOE shall ensure that the latest valid version of “Project emissions from flaring” tool at the time of submitting the request for registration is used. Please refer to VVM v1.2 para. 67. 4) The monitoring parameter "end-use of final sludge" shall be included in the monitoring plan, in compliance with the methodology AMS III.H version 16. Please refer to VVM v1.2 paragraph 124. |
|
Date | 16 Nov 12 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: