Project 6005 : Xinjiang Awati Biomass Power Generation Project
Project title Xinjiang Awati Biomass Power Generation Project
- project design document (491 KB)

PDD appendices
Appendix 1 - Appendix I - response to GSP comments.pdf (174 KB)
Appendix 2 - Emission Reduction calculation sheet_ Awati Biomass.xls (110 KB)
Appendix 3 - NPV calculation sheet_ Awati Biomass.xls (171 KB)


- registration request form (206 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (187 KB) authorization (187 KB)
Authorized Participants: National Bio Energy Co., Ltd.
Other Parties Involved France , involved indirectly approval (396 KB) authorization (396 KB)
Authorized Participants: EDF Trading Limited (withdrawn as of 27/01/2022)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
Standardized baselines used N/A
Amount of Reductions 66,671 metric tonnes CO2 equivalent per annum
Fee level USD 11834.2
Validation Report Validation report (517 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 28/01/2022
MoC Annex 2 (Withdraw Project Participant (Voluntary)) valid as of 27/01/2022
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 18/11/2021
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 19/03/2014
Registration Date 23 Apr 12 (Date of registration action 06 Jul 12)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 May 12 - 30 Apr 19 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation

Monitoring report: 01 May 2012 - 30 Apr 2019 (300 KB)
Issuance request state: Awaiting issuance request
[Full view and history]